Products

MV and LV
switchgear

MV 3.6–40.5 kV · LV up to 6,300 A · 50/60 Hz

Juneng offers metal-clad MV switchgear from 3.6 to 40.5 kV, withdrawable and fixed LV switchgear up to 6,300 A, and the motor control panels behind them. Built in Shouguang, China.

LV switchgear assembly hall at the Juneng plant in Shouguang

Configured to your single-line diagram.

Juneng switchgear is configured from your single-line diagram or load list. Delivered abroad at 11 kV in Vietnam and DR Congo and at 33 kV in Tanzania and Malaysia.

LV switchgear assembly hallWiring an LV panel
CNC punching for switchgear enclosuresSheet-metal line, ShouguangLV panels ready for dispatch

MV switchgear

Metal-clad withdrawable:

  • KYN28A-12 / KYN28A-24 · 3.6–24 kV, indoor
  • KYN61-40.5 · 35 kV systems, single or sectionalised busbar

Gas-insulated:

  • JNFL-12 · 12 kV, stainless-steel tank, SF6 or eco-gas

Distribution:

  • Ring Main Units
  • Cable Branch Boxes
  • Vacuum Circuit Breakers

Design reference:

  • IEC 62271-200 / GB/T 3906
  • Type-test documentation per model on request

LV switchgear and panels

Withdrawable:

  • MNS / GCS / GCK · 400 V (690 V), up to 6,300 A, 50/60 Hz

Fixed type:

  • GGD · 380/400 V, up to 3,150 A

Motor control and process panels:

  • MCC and VFD Panels
  • PLC Control and Soft-Starter Panels
  • Fire-Pump Panels · up to 660 V

Distribution:

  • XL / PZ Distribution Boards, Lighting and ATS Boxes
  • PV Grid-Connection Cabinets · 400 V AC

Design reference:

  • IEC 61439 / GB/T 7251
  • Type-test documentation per model on request

Enclosures, busbars and assembly on our own lines

Enclosures are punched and formed on two Prima Power flexible sheet-metal lines and four Yawei lines, at up to 700 strokes/min and ±0.05 mm positioning. Six automatic busbar machining centres hold hole pitch to ±0.2 mm, and withdrawable units are built on a dedicated drawer line.

20,000 switchgear assemblies a year. Built to order.

Robotic welding cell for switchgear enclosures
20,000Assemblies a year

Built to order

Send your single-line diagram or load list. Our engineers return a configuration and budget price within seven working days. Lead time is confirmed with the order.

Request a quote
Robotic press brake for enclosure panels
7MV/LV assembly lines

One digital file per unit

Seven MV/LV assembly lines run on our own MES, so every unit has a traceable production record.

See the factory

A switchgear order follows the same six ordering steps as our transformers, from your single-line diagram to site support. See the ordering steps

Models

Specifications by model

Let’s build your next plant together.

MV SWITCHGEARTRANSFORMERLV PANEL