Cast-resin dry-type transformers
SCB10–SCB18 · 10 kV · 30–3,150 kVA
Epoxy cast-resin dry-type transformers, 10 kV, 30 to 3,150 kVA, for indoor plant substations, data centres, hospitals and buildings, where oil is not wanted near people or process areas. Forced-air cooling raises output by up to 50 %. Built in Shouguang, China.
Request a quote
Ratings we publish
Values marked “on request” are set per project from your single-line diagram, or are still being collected from the factory.
| Insulation | Epoxy cast-resin, vacuum cast |
|---|---|
| Series in production | SCB12 · SCB14 · SCB18 (range SCB10–SCB18) |
| HV rated voltage | 10 kV |
| Rated power | 30–3,150 kVA |
| Cooling | AN / AF; forced air raises output by up to 50 % |
| Enclosure | With or without; IP rating on request |
| Insulation class, temperature rise, losses, impedance, vector group | on request |
| Temperature monitoring and fans | on request |
| Dimensions and weight | on request |
How it is built
Two vacuum resin-casting units, three curing ovens, ten winding machines and three double-layer foil winders. Every cast-resin unit is checked in our own partial-discharge test room before dispatch.
Exported
SCB18 units of 2,000 kVA for a copper operation in Zambia, SCB14 units for Cambodia.
Questions buyers ask
Send your single-line diagram to [email protected] or on WhatsApp +86 180 6966 6866.
Cast-resin for indoor substations close to people, data halls and hospitals; oil-immersed for outdoor yards and compact substations where it costs less.
Yes, cast-resin units are checked in our own partial-discharge test room before dispatch.
Juneng holds eight transformer type-test reports from two CNAS-accredited laboratories (Shandong Institute for Product Quality Inspection: 6; Suzhou Electrical Apparatus Science Academy: 2). The reports carry the ILAC-MRA mark. Copies and the list of models covered are sent on request. Routine test reports are issued for every unit.
Send the single-line diagram, system voltages, short-circuit level and the load list. Our engineers return a configuration and budget price within seven working days; lead time is fixed with the order.
