Products

Compact and e-house
substations

Up to 35 kV · European BXW · American pad-mounted · E-house

Prefabricated compact, pad-mounted and e-house substations up to 35 kV, built for industrial plants, industrial parks and solar and wind farms.

Juneng prefabricated substation on site

Compact substations engineered to your single-line diagram

Juneng compact substations combine MV switchgear, a transformer and LV panels built on our own lines in Shouguang. The three compartments are engineered together, so ratings, terminals and protection settings match.

Oil-immersed distribution transformers in the Juneng factoryCast-resin dry-type transformers
35 kV transformer with on-load tap changerRobotic press brake for enclosure panelsJuneng plant in Shouguang

Standard scope

  • European-Type BXW Compact Substation
  • American-Type Pad-Mounted Substation
  • Prefabricated Cabin (E-House) Substation up to 35 kV
  • Renewable-Energy Step-Up Station, 10 kV / 35 kV
  • MV Switchgear, Transformer and LV Panels from Our Own Lines
  • Oil-Immersed S13 / S20 / S22 Transformer, 10 kV
  • Cast-Resin SCB10 – SCB18 Transformer, 10 kV
  • Hermetically Sealed Oil-Immersed Tank
  • Enclosure from Our Sheet-Metal Lines, Electrostatic Powder Coating
  • One Digital Production File per Unit (MES)
  • Design reference: IEC 62271-200 / GB/T 3906 (MV)
  • Design reference: IEC 61439 / GB/T 7251 (LV)
  • Type-test documentation per model on request

Specified per project

  • Ratings and Dimensions on Request
  • Oil-Immersed or Cast-Resin Transformer
  • AN / AF Cooling for Cast-Resin Units (+50 % with Forced Air)
  • Amorphous-Alloy Transformer (SBH15)
  • On-Load Capacity and Voltage Regulating Transformer
  • Step-Up Transformer for Solar or Wind
  • Busway or Busbar Bridge to the LV Switchboard
  • 60 Hz
  • Installation, Testing and Commissioning Support

Transformer, enclosure and site work in one order

The transformer inside is a Juneng unit. For transformers we hold 8 type-test reports from CNAS-accredited laboratories. Enclosures come off our Prima Power flexible sheet-metal lines, robotic bending and welding cells and automatic powder-coating line. On site, we hold Grade II licences for power engineering construction and for installing and testing power facilities.

Substations up to 35 kV. Built to order.

Transformer workshop, Shouguang
35 kVMax. voltage

Built to order

Send your single-line diagram and site conditions. Our engineers return a configuration and budget price within seven working days. Lead time is confirmed with the order.

Request a quote
Aerial view of the Juneng plant in Shouguang
3,000,000kVA of transformers a year

Transformers from our own lines

The transformer in each substation is built on the same site, with capacity for 3,000,000 kVA a year.

See the factory

A substation order follows the same six ordering steps as our transformers, from your single-line diagram to site support. See the ordering steps

Models

Specifications by model

Let’s build your next plant together.

MV SWITCHGEARTRANSFORMERLV PANEL