E-house prefabricated cabin substations
up to 35 kV · sealed, temperature-controlled
Primary and secondary equipment installed in a sealed, temperature-controlled, dust-free cabin at the factory, up to 35 kV. Used as the main substation of a mine or plant at 33 / 35 kV, where a substation building would take months to build. Built in Shouguang, China.
Request a quote
Ratings we publish
Values marked “on request” are set per project from your single-line diagram, or are still being collected from the factory.
| Content | Primary and secondary equipment in one cabin |
|---|---|
| Voltage | up to 35 kV |
| Cabin | Sealed, temperature-controlled, dust-free |
| Typical equipment | KYN61-40.5 incoming switchgear, KYN28A-12 distribution, protection and control |
| Rating, short-circuit level, IP, cabin material | on request, per project |
| Standards | Design standards: GB/T 17467. Type-test documentation per model on request. |
Where it goes
Mining concentrators at 33 / 35 kV, remote plants and sites with dust or high ambient temperature.
Questions buyers ask
Send your single-line diagram to [email protected] or on WhatsApp +86 180 6966 6866.
The incoming and distribution switchgear, protection, auxiliary supply and control, laid out from your single-line diagram.
Send the single-line diagram, system voltages, short-circuit level and the load list. Our engineers return a configuration and budget price within seven working days; lead time is fixed with the order.
Orders ship from Qingdao. Packing, inspection and the Incoterm are agreed in each contract; factory acceptance tests can be witnessed by the buyer or a nominated inspection agency.
